Checklist · Plant & Equipment Inspections

Test and Tag Register

Register for recording the inspection and testing of portable electrical equipment, leads and RCDs in line with AS/NZS 3760, with test results and retest dates. Use one sheet per testing session or site.

37 checklist items · Last reviewed

Checklist Items

ItemPass / YesFail / No
TESTING SESSION DETAILS
Test Date
Site / Workplace
Environment (e.g. construction site, workshop, office)
Retest Interval Applied (e.g. 3 months construction)
Tester Name
Tester Competency / Licence Reference
Test Instrument Make, Model & Serial Number
Test Instrument Calibration Due Date
ITEM 1
Item 1: Description & Asset ID
Item 1: Test Type (visual / earth continuity / insulation / RCD trip time)
Item 1: ResultPassFail
Item 1: Retest Due
ITEM 2
Item 2: Description & Asset ID
Item 2: Test Type (visual / earth continuity / insulation / RCD trip time)
Item 2: ResultPassFail
Item 2: Retest Due
ITEM 3
Item 3: Description & Asset ID
Item 3: Test Type (visual / earth continuity / insulation / RCD trip time)
Item 3: ResultPassFail
Item 3: Retest Due
ITEM 4
Item 4: Description & Asset ID
Item 4: Test Type (visual / earth continuity / insulation / RCD trip time)
Item 4: ResultPassFail
Item 4: Retest Due
ITEM 5
Item 5: Description & Asset ID
Item 5: Test Type (visual / earth continuity / insulation / RCD trip time)
Item 5: ResultPassFail
Item 5: Retest Due
ADDITIONAL ITEMS
Further items tested (asset ID, result, retest date)
FAILED ITEMS
Failed items and reason for failure
Failed items fitted with out-of-service tag and removed from useYesNo
Repair / disposal action and who is responsible
SUMMARY & SIGN-OFF
Total Items Tested
Total Items Passed
Total Items Failed
Tester Signature
Site Supervisor / Manager Signature