Free SWMS Templates
Professionally written Safe Work Method Statement templates for Australian high-risk construction work. Free to download as PDF or Excel.
Working at Heights
SWMS for tasks involving a risk of falling more than 2 metres, including scaffolding, roof access, EWP operations and structural steel erection.
- Scaffolding Erection and Dismantling
- Roof Access and Maintenance
- EWP Boom Lift Operations
- + 12 more
Demolition
SWMS for demolition work including manual strip-outs, mechanical demolition and structural demolition that affects the physical integrity of a structure.
- Manual Demolition
- Mechanical Demolition
- Structural Demolition
- + 8 more
Asbestos & Hazardous Materials
SWMS for work involving or likely to disturb asbestos, lead paint, or other hazardous materials requiring specialist removal procedures.
- Non-Friable Asbestos Removal
- Friable Asbestos Removal
- Lead Paint Removal
- + 7 more
Excavation & Earthworks
SWMS for excavation work including trenching, pier drilling, road works and earthmoving operations deeper than 1.5 metres.
- General Excavation
- Trenching and Shoring
- Road Works and Traffic Management
- + 11 more
Crane, Lifting & Rigging
SWMS for crane operations, rigging, slinging and all lifting activities involving powered mobile plant or mechanical lifting equipment.
- Mobile Crane Operations
- Tower Crane Operations
- Rigging and Slinging
- + 9 more
Electrical Work
SWMS for work on or adjacent to energised electrical installations, including new installations, switchboard work, solar PV and underground cable.
- General Electrical Installation
- Switchboard Work
- Solar PV Installation
- + 13 more
Confined Spaces
SWMS for work in confined spaces including tanks, vessels, sewers, underground chambers and any space with restricted access and egress.
- Underground Confined Space Entry
- Tank and Vessel Entry
- Sewer and Drainage Work
- + 6 more
Structural & Formwork
SWMS for structural work including timber framing, formwork erection, tilt-up panels and precast concrete installation.
- Timber Framing
- Formwork Erection and Stripping
- Tilt-Up Panel Construction
- + 12 more
Plumbing & Gas
SWMS for plumbing, gas fitting and roof plumbing work including hot water systems, stormwater drainage and gas installations.
- General Plumbing
- Gas Fitting and Installation
- Hot Water System Installation
- + 14 more
Welding & Hot Work
SWMS for welding, cutting, grinding and other hot work activities that introduce an ignition source and associated fire and fume risks.
- MIG Welding
- TIG Welding
- Oxy-Acetylene Cutting
- + 7 more
Concrete, Masonry & Roofing
SWMS for concrete pouring and finishing, concrete cutting, bricklaying, blockwork, and metal and tile roof installation.
- Concrete Pouring and Finishing
- Concrete Cutting
- Bricklaying and Blockwork
- + 11 more
General Construction
SWMS for general construction trades including painting, flooring, tiling, insulation, HVAC installation and carpentry fit-out.
- Painting and Decorating
- Flooring Installation
- Tiling Work
- + 21 more
Frequently asked questions
When is a SWMS required?
A Safe Work Method Statement is required before any high-risk construction work (HRCW) starts. The model WHS Regulations list 19 HRCW types, including work where there is a risk of falling more than 2 metres, work on or near energised electrical installations, demolition of load-bearing structures, trenches deeper than 1.5 metres, and work in confined spaces.
Who is responsible for preparing the SWMS?
The person conducting a business or undertaking (PCBU) carrying out the high-risk construction work must prepare the SWMS, in consultation with the workers doing the job. On larger projects the principal contractor must also obtain it before the work starts.
Do workers have to sign the SWMS?
The regulations require the SWMS to be kept and available on site, and workers must be made aware of it before they start. In practice almost every principal contractor requires every worker to read and sign it, so that you can show who was briefed and when.
Can I use a free SWMS template?
Yes, as a starting point. A template only becomes compliant once you review it and edit it to match the actual site, task, hazards and controls, then consult your workers on it. Treat the hazards and controls on this page as a checklist to adapt, not a finished document.
How long do I need to keep a SWMS?
Under the model WHS Regulations the SWMS must be kept for the duration of the high-risk construction work. If a notifiable incident occurs during the work, it must be kept for at least 2 years after that incident.