SWMS template · Plumbing & Gas

Sewer Connection — Safe Work Method Statement

Safe Work Method Statement for connecting a new property sewer drain to a live water authority sewer main or existing junction, including excavation to the main, live-flow control, cut-in or saddle connections and inspection.

Last reviewed

Category
Plumbing & Gas
HRCW
3 categories
Job steps
6
Hazards rated
13
PPE items
7

This template covers the point where private drainage meets a live authority sewer. It is separate from general drainage installation because the work is on a live main carrying sewage, often at depth and in a road or easement. A connection usually involves an excavation deeper than 1.5 metres, a possible contaminated or flammable atmosphere from the sewer, and excavators and trucks on site, all of which are high risk construction work. A SWMS is required.

The hazards specific to a sewer connection are trench collapse at the main (sewer mains are often the deepest service on a property), hydrogen sulfide and low oxygen in the trench once the main is opened, and contact with raw sewage carrying bacteria and viruses. Live flows mean the main may need to be blocked, bypassed or pumped while the connection is made, and blockages can surcharge upstream properties. Older mains are often vitrified clay or asbestos cement, and cutting or drilling asbestos cement pipe is asbestos work that needs its own controls. Other services, such as water, gas and electrical cables, often run close to the sewer.

Water authorities control who can connect to their sewers. Most require an approved connection application and may require the work to be done by their own crews or by plumbers and drainers they have accredited, with inspection before backfill. The drainer must hold the licence required in your state or territory, and the work must comply with AS/NZS 3500 and the authority's standards. Check the authority's requirements before starting.

Your SWMS must cover the approval and inspection process, service location, excavation support, atmosphere monitoring, flow control and bypass, asbestos cement pipe handling, sewage hygiene, and emergency response.

Customise this template with the water authority approval number, main material, size and depth, connection method, BYDA reference, trench support system, flow control or bypass arrangements, gas detector details, traffic management, and the licence or accreditation numbers of the workers.

High Risk Construction Work Types

  • Work in or near a shaft or trench deeper than 1.5 metres, or a tunnel
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work in an area with movement of powered mobile plant

Personal Protective Equipment

  • Hard hat
  • High-visibility vest
  • Steel-capped gumboots
  • Nitrile gloves under heavy-duty waterproof gloves
  • Safety glasses or face shield
  • Personal four-gas detector (H2S, O2, LEL, CO)
  • P2 respirator and disposable coveralls (asbestos cement pipe)

Risk Assessment

RatingsCatastrophicHighModerateLow

Step 1Approvals, service location and set-up

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Striking water, gas or electrical services near the sewerCatastrophicObtain a Before You Dig Australia (BYDA) enquiry and the authority's sewer plans showing the main and junction location and depth. Locate and mark services, and hand dig or vacuum excavate within the tolerance zone of marked services.LowLicensed Drainer / Excavator Operator
Connection made without approval or to the wrong mainModerateHold the authority's connection approval on site and book the required inspections. Confirm the junction or connection point against the plans before excavation.LowLicensed Drainer

Step 2Excavation to the sewer main

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Trench collapse burying workers at the mainCatastrophicShore, bench or batter any excavation over 1.5 metres before workers enter, using a shoring system selected for the soil and depth. Keep spoil and plant at least 1 metre from the edge, or further as the shoring design requires. Provide a ladder within easy reach and inspect the trench at the start of each shift and after rain.LowSite Supervisor / Licensed Drainer
Struck by excavator during diggingHighKeep workers out of the excavator's swing radius and out of the trench while digging. Agree signals with the operator and use a spotter near services.LowExcavator Operator

Step 3Atmosphere monitoring and flow control

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Hydrogen sulfide or low oxygen in the trench once the main is openedHighMonitor the trench continuously with a calibrated, bump-tested four-gas detector worn at breathing height. Ventilate deep trenches with a blower when the main is open. Leave the trench immediately if the alarm sounds and do not re-enter until readings are clear.LowLicensed Drainer
Sewage flooding the trench or surcharging upstream propertiesHighPlan the work for low-flow periods. Use the authority-approved flow control: pipe plugs or bypass pumping sized for peak flow, with someone monitoring upstream levels. Do not leave plugs unattended; remove them when the work stops.ModerateLicensed Drainer

Step 4Cutting in or fitting the connection

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Exposure to asbestos fibres when cutting or drilling asbestos cement mainsHighIdentify the main material before cutting. For asbestos cement, use non-powered cutting tools or the authority's approved method, keep the pipe wet, wear a P2 respirator and coveralls, and bag offcuts as asbestos waste. Do not use angle grinders or power saws on AC pipe.LowLicensed Drainer
Contact with raw sewageHighWear waterproof gloves, glasses and gumboots. Avoid touching the face. Wash hands before eating or smoking, provide wash water on site, and cover cuts. Workers should talk to their doctor about hepatitis A and tetanus vaccination.ModerateAll Workers
Manual handling of heavy pipes and fittings in the trenchModerateLower pipes into the trench with the excavator using rated lifting gear, not by hand. Work in pairs for heavy fittings.LowLicensed Drainer

Step 5Inspection, testing and backfill

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Defective connection causing leaks or infiltrationModerateTest the new drain as required by AS/NZS 3500 and the authority. Have the connection inspected before backfill and record the inspection or CCTV check.LowLicensed Drainer
Collapse during shoring removal and backfillHighBackfill in layers and remove shoring progressively as the shoring supplier specifies, with no one in the trench as panels are pulled. Compact around the pipe by hand before using a compactor.LowSite Supervisor

Step 6Reinstatement and decontamination

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Infection from contaminated tools and PPEModerateWash down tools and boots, bag disposable PPE, and wash before leaving site. Dispose of asbestos waste at an approved facility.LowAll Workers
Open excavation or unstable surface left after workModerateReinstate the surface and remove barriers only when the area is safe. Fence any excavation left open overnight.LowSite Supervisor

Relevant Codes of Practice

Worker Acknowledgement

By signing below, I confirm that I have read, understood and agree to comply with this Safe Work Method Statement.

NameDateSignature
NameDateSignature
NameDateSignature
NameDateSignature
NameDateSignature
NameDateSignature
NameDateSignature
NameDateSignature

Get this template

Free. Edit the Excel version, or print the PDF and fill it in by hand.