General Construction SWMS Templates

SWMS for general construction trades including painting, flooring, tiling, insulation, HVAC installation and carpentry fit-out.

Painting and Decorating

Safe Work Method Statement for internal and external painting and decorating work including surface preparation, priming and application of paint by brush, roller and spray. Applicable to residential and commercial painting.

4 tasks6 risks identified6 PPE items

Flooring Installation

Safe Work Method Statement for the installation of floating floors, direct-stick timber, vinyl plank (LVP/SPC), and engineered flooring systems, including adhesive handling, subfloor preparation, and cutting operations, in compliance with Australian WHS legislation.

5 tasks7 risks identified6 PPE items

Tiling Work

Safe Work Method Statement for wall and floor tiling operations including substrate preparation, adhesive application, tile cutting, grouting, and silicone application in compliance with Australian WHS legislation.

5 tasks8 risks identified6 PPE items

Insulation Installation

Safe Work Method Statement for the installation of glasswool, rockwool, and polyester bulk insulation batts and blankets in ceiling, wall, and underfloor applications, in compliance with Australian WHS legislation.

4 tasks6 risks identified6 PPE items

HVAC Installation

Safe Work Method Statement for the installation of heating, ventilation, and air conditioning systems including ductwork fabrication and installation, condenser unit placement, indoor unit mounting, and refrigerant pipework, in compliance with Australian WHS legislation.

5 tasks7 risks identified7 PPE items

Carpentry Fit-Out

Safe Work Method Statement for internal carpentry fit-out works including door frame installation, architrave and skirting fixing, door hanging, built-in cabinetry installation, and general internal joinery, in compliance with Australian WHS legislation.

5 tasks7 risks identified6 PPE items