Checklist · Daily Plant Prestarts

EWP / Scissor Lift Daily Pre-Start Inspection

Daily pre-start safety inspection for elevated work platforms (scissor lifts, boom lifts) in accordance with AS 2550.10 and Australian WHS regulations.

40 checklist items · Last reviewed

Checklist Items

ItemPass / YesFail / No
UNIT IDENTIFICATION
Plant/Asset ID
EWP Make & Model
Inspection Date
Operator Name
High Risk Work Licence Number (if boom type)
Hour Meter Reading
FLUID & POWER LEVELS
Engine oil level (petrol/diesel models)PassFail
Hydraulic oil levelPassFail
Fuel level / battery charge adequate for shiftYesNo
Battery electrolyte level (electric models)PassFail
Battery terminals – no corrosion or loose connectionsPassFail
No visible fluid leaksYesNo
STRUCTURAL CONDITION
Platform floor – no cracks, holes or loose fittingsPassFail
Guardrail system – all rails, mid-rails and toe boards in placePassFail
Entry gate / chains – functional and self-closingPassFail
Scissor arms / boom – no visible cracks or deformationPassFail
Pivot pins and locks – all securedPassFail
Chassis – no visible damage or corrosionPassFail
TYRES & DRIVE
Tyre condition – no cuts, chunking, excessive wearPassFail
Tyre pressures within specification (pneumatic models)PassFail
Drive/steer mechanism – no unusual noise or vibrationPassFail
CONTROLS & SAFETY DEVICES
Ground controls – all functions operationalPassFail
Platform controls – all functions operationalPassFail
Dead-man / enable switch functionalPassFail
Emergency lowering system functionalPassFail
Emergency stop (ground level) functionalPassFail
Overload/tilt sensor operationalPassFail
Pothole guards / outriggers deploy correctly (if fitted)PassFail
Horn functionalPassFail
Beacon / flashing light functionalPassFail
ANCHORAGE & FALL PROTECTION
Anchor point(s) on platform – no damagePassFail
Lanyard/harness anchor rating placard visibleYesNo
Fall protection equipment available on platformYesNo
DOCUMENTATION
Safe Work Load (SWL) placard legibleYesNo
Operators manual on machineYesNo
Last service record reviewedYesNo
DEFECTS & SIGN-OFF
Defects / faults identified (describe or "None")
Is plant fit for operation?YesNo
Operator Signature
Supervisor / Responsible Person Signature